Third Party Inspection
International Procurement Service
Metal Material Testing
As a third-party testing organization with a professional metal material testing laboratory, we are dedicated to providing comprehensive metal property testing services.
Our testing engineers have years of experience and can tailor scientific and reasonable testing plans according to your needs. Our testing process is rigorous and fair, with complete equipment and precise instruments, resulting in reliable testing reports to support your business development.
The testing duration for metal materials
Metal material testing usually takes between 1 to 7 working days, but you can get it done faster with expedited services if needed. The testing engineer will decide the exact duration based on how complex the project is.
The cost of metal material testing
The cost of metal material testing depends on the type of project and how complex it is. The engineer will give you a quote based on your specific needs.
Inspection items
Chemical Composition Analysis
Mechanical Properties Testing
Ultrasonic Testing
Structural Analysis
Heat Treatment
Magnetic Particle Testing
Dimensional Testing
Visual Testing
Customized Testing
Process of metal material testing report
Communicate with engineers to determine the requirements for metal material testing
Have the commissioning units fill out the testing commissioning order and confirm payment
Send the samples, conduct laboratory testing, and issue testing results
Based on the testing content, generate the metal material testing report
Send the report and provide after-sales value-added services
Validity Period of Metal Material Inspection Report
In theory, the third-party test report for metal materials does not have a defined expiration period. If there are no changes in the material properties or updates to the testing standards, the report remains valid for an extended period. However, if there are any alterations to the content of the current report, it becomes necessary to redo the testing and obtain a new report. Additionally, the validity of the report can also be influenced by the requirements of the requesting party.